Central Kitchens
Plan a production base that can supply multiple outlets on a repeatable dispatch schedule.
Work backward from the first outlet delivery. Map batch preparation, portioning, packing, loading and vehicle departure.
Walk the trolley route with a full-size container. Check loading windows, return flows and space for orders awaiting dispatch.
Use the kitchen rental viewing checklist